PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Pour Stops along edges of Derrick -3 (2nd Floor) Facing North-East (800x600).jpg Welded beam at Derrick -2  (800x600).jpg Before installing of pour stops Facing East (800x600).jpg Compacted area (underground Piping) Facing North-West (800x600).jpg Continued wiring the electrical panel Facing East (800x600).jpg Installing beam at Stair -4 (2nd Floor) Facing South (800x600).jpg Installing rebar mats at Elev. 5,6 Facing North-West (800x600).jpg Installing water test on the water and fire service pipes Facing South (800x600).jpg Verizon working on removing and transferring the lines at Rahway Avenue Facing South-East (800x600).jpg
Previous pageNext page Continued wiring the electrical panel Facing East (800x600)
Continued wiring the electrical panel Facing East (800x600)